Summary of filing information
Resource report1-General project description
Location and description of piprline facilities
Location and description of aboveground facilities
Keyspan meter station, East Boston
Distrigas meter station, Everett
Exelon Mystic Station meter station, Everett
Algonquin J-System pressure control, Everett
Relationship to the Algonquin HubLine project
Offshore pipeline facilities
Onshore pipeline facilities
Pipeline/material storage yards and contractor yards
Additional temporary workspace
Offshore construction procedures
Horizontal directional drill
Shallow water construction
Everett Extension Offshore construction procedures by milepost
Onshore construction procedures
Rugged topography == Residential areas
Road crossings/in-street construction
Rock removal and blasting
Environmental training for construction
Operation and Maintenance
Construction schedule and workforce
Non-jurisdictional facilities
Public agency and landowner consultation
Permit/Resource agency contacts
Post-filing public outreach
Figures: system map; HDD process; land to water drill; Water to water drill; Shallow water lay vessel spread; Typical dredge vessel spread; Drilled crossing exit location
Tables: Everett Extension Pipeline facilities; Everett Extension aboveground facilities; Land requirements for the Everett Extension Pipeline facilities; Summary of land area affected by contractor staging areas; Anticipated schedule to complete remaining field surveys for the Everett Extension
Appendices: Project mapping; Aboveground facility plot plans; Typical right-of-way configuration; Everett Extension-soil erosion control plan; Project line list of affected landowners; Agency contact list; Public agency/landowner consultation- Project correspondence and public participation materials.